0242 Installed in the cement bin of the concrete plant.
Easily solve powder bridges that cannot be resolved with knockers or vibrators.
This is an introduction to a case where a bridge breaker was installed in the cement bin of a concrete plant. Due to the issues with the cement input position and the inclination of the bin, residual cement adhered to one side of the rectangular cement bin. As a result of consultations, the problem was resolved by installing five units of our standard equipment, the BD-15S-B, on that side. [Bin Dimensions, etc.] ■ Top: Approximately 1000×800 ■ Bottom: Approximately 250×250 ■ Inclination of the installation surface: About 50° This bridge breaker can be easily installed by simply drilling a hole in the hopper wall. Additionally, since it is a low-cost device, the expenses remain limited even when multiple units are installed. *For more details, please refer to the catalog or feel free to contact us. *We have published numerous implementation examples on our website, which can be checked via the link below.
- Company:ミナギ
- Price:Other